...and on the 8th day

The last 8 days have seen some considerable work on the house while we wait for a new batch of bricks to arrive.

The day after the upper level wall frames went up they popped the roof trusses up on top. We could now visualise how the house will look complete and from street level, it looks pretty big!

#homesforlife




Acro Prop supporting the rear beam over the alfresco

Upstairs is looking good!

From this angle the house looks huge! Our big window on the left is going to be awesome.

Over the last few days the plumbers have been on site laying all the piping for our water supply, fixing pipes to our upstairs Bathrooms and WC and laying pipes for our gas.


Cavity for our instant hot water. Red is hot, black is cold and yellow is gas.

Piping for upstairs bathrooms and WC

During this time the windows arrived on site also :)

Little ones for WC 

There's a few there

Our huge front window :)

Highlight windows for Study, Voids, Bedrooms, EnSuite etc

Alfresco doors :)
Driving home today I swung paste block on the way back and to my surprise all of the windows have been installed. Exciting times!

BIG window!

3/4 of the big window from inside. This room is going to be amazing with its 3.3m ceilings

Dining, Laundry and WC

Highlight window in Ella's room

View from our backyard

Top Left: Josh's highlight window, Ella's main window and Living downstairs. 



Study highlight windows. We are going to have nice breeze through these

Fixed highlight window in the void next to the stairs & Ella's small window in her WIR

Window in our walk in pantry

Kitchen splash back window

Dining windows


Dining windows

Master sliding door and En-Suite window. Our balcony will be here :)

View from the front

More to come...


Comments

Popular Posts