..another brick in the wall

Registration really can't be that far off now...surely!

Went for a drive earlier today and discovered that much of the retaining wall has been placed along Brotheridge Avenue, even on our side.  Preparations are also being made to lay some tar on our road, with a second trip out late today revealing some lovely black stuff going down on our road.

The view from up high. Brotheridge Ave on the right.

Good to see the walls going in

Walls


Looks like we have walls on one side of 2357

Go Digger, GO!



In even more exciting news, literally 10 minutes before I arrived at Calderwood today, the teams had opened up the second stage of Escarpment Drive, linking the recently opened Djindi Bridge to the roadway leading through 1C and 1D out to the Oaks Release. This is actually quite good as it greatly reduces the travel time to our block.

Here's a short video of the trip back :)



Comments

  1. Can't wait to do that drive tomorrow. It's looking mighty close to being done Timmy, very excited for you guys, going to be a great place to call home 😃

    ReplyDelete
    Replies
    1. Thanks Irene! Did you go for a drive?

      Delete
  2. Awesome! Thanks for sharing. It's looking great with the walls in.

    ReplyDelete

Post a Comment

Popular Posts